Ground screw answer hub

The questions people actually ask.

97 direct answers across buying, installation, loads, ground conditions, durability, regulations, applications and UK coverage — with deeper owner pages where the answer depends on the project.

97 direct questions10 decision areasUK-wide supply & installation
Forti Nova team carrying out a ground screw installation
Technical answers from real projects
Installation experience, technical guidance and project-specific caveats sit behind the answer library.
01 · 8 answers

Ground screw basics

What ground screws are, how they work and the terminology buyers come across.

02 · 9 answers

Cost, prices & buying

What affects price, how to compare quotes and where supply-only or trade buying fits.

03 · 10 answers

Size, quantity, loads & design

How screw quantity, depth, diameter, spacing and structural capacity are decided.

04 · 10 answers

Ground & site conditions

Clay, rock, fill, slopes, wet ground, obstructions and other site conditions that can change the answer.

05 · 18 answers

Installation & site process

How installation works, what access is needed, timing and what happens when a site is difficult.

06 · 7 answers

Durability, corrosion & maintenance

Rust, galvanising, service life, removal and what to check about the actual product.

07 · 9 answers

Building Regulations, engineering & approval

Building Control, calculations, planning and the evidence that may be needed on structural projects.

08 · 10 answers

Applications

Where ground screws can fit and what changes between garden buildings, decks, extensions and larger structures.

09 · 7 answers

Comparisons & alternatives

Concrete, pads, screw piles, anchors and when a different foundation makes more sense.

10 · 9 answers

Quotes, installers & UK coverage

What to send, whether a site visit is needed and how local supply or installation enquiries work.

How to use the answers

A direct answer first. Evidence and detail second.

01

Start with the exact question

Each answer opens with the practical response rather than making you read a long introduction first.

02

Follow the owner page

Cost questions lead to Cost, installation questions to Installation, load questions to Load Calculations and so on.

03

Do not copy a generic answer onto a structural job

Where the result depends on the building, ground or product, the answer says so and points to the information needed next.

Project-specific answer

Still not answered? Send the actual project.

Send the structure, dimensions, postcode, drawings and access information you have. We will answer from the project rather than inventing a generic number.

Ask about your project